Soo Locks Opening 2024. 17, 2023, through april 24, 2024, to perform dam safety inspections. The contract will be awarded in. Soo locks 2023 opening scheduled for march 25.
(wxyz) โ three of the largest ships on the great lakes are lined up for the soo locks. Marie will close to all marine traffic beginning 11:59.
Soo Locks Opening Date 2024 Soo Locks Closing For Seasonal Repair, Maintenance > Detroit :
Soo locks park 329 w.
Marie Will Close To All Marine Traffic Beginning 11:59.
Although the visitor center is open seasonally, the park is open year round at the below times:
Images References :
On December 17 Through April 24, 2024, To Perform Dam Safety Inspections.
Soo locks park 329 w.
And Last Updated 7:45 Am, Mar 24, 2022.
The soo locks hydro plant tail race is currently open until a date to be determined in spring 2024.